This project involved installing 100m of 250mm PE pipe inside an existing reinforced concrete pipe and PE pipe using pipe bursting and slip lining technologies. The existing sections of pipe had become completely blocked with tree roots. CDS also installed and rehabilitated a number of manholes and catchpits.