All All CURVED ALIGNMENTS DIRECTIONAL DRILLING DRILLING IN ROCK LOW GRADE INSTALLATIONS PIPE BURSTING / SLIP LINING SENSITIVE ENVIRONMENTS Manukau North Local Wastewater Network Upgrade This Watercare contract involved the upgrading of the wastewater network in 9 separate areas in the Howick and Pakuranga area in Auckland. Kahika Rising Main – HDD Installation HDD installation for the Kahika Rising Main Replacement and Diversion Okahu Bay Separation Project CDS completed the HDD installations for the Okahu Bay Stormwater Separation project for CB Civil & Drainage and their client Auckland Council Redhills Wastewater Infrastructure Project The Redhills project involved approximately 300m of 450mm diameter, 1km of 400mm diameter, 210m of 710mm diameter, 560m of 355mm diameter and two stream crossings of 630mm diameter and 560mm diameter polyethylene (PE) pipe Lawsons Creek Branch Sewer Early Works The Lawsons Creek Branch Sewer Early Works were a critical installation done for Watercare Services Limited and their main contractor Pipeline & Civil Limited Rotokauri Bulk Watermain CDS installed over 1km of 560mm OD PE pipe and over 1km of 630mm OD PE pipe using CDS Maxi Rig and DitchWitch® JT100 Rig Takitimu Street Stormwater Upgrade The Takitimu Street Stormwater Upgrade was a Auckland Council project undertaken by CDS New Zealand Ltd. This project was commissioned by the council to increase the stormwater capacity and facilitate further development in the catchment. Hingaia Peninsula Trunk Sewer CDS installed in excess of 1.5km of DN 475 PVC pipe for this project, at depths exceeding 6m. Hastings Pde Stormwater Renewals This project involved installing 100m of 250mm PE pipe inside an existing reinforced concrete pipe and PE pipe using pipe bursting and slip lining technologies Mangawhai Pump Station and Rising Main This project involved installing 850m of wastewater rising main and a pump station. North Waitakere Sewer CDS Installed 3.5km of 400mm to 630mm pipeline Tauranga Te Awanui Drive Watermain Slip Lining CDS installed 680m of 315mm PE pipe via slip lining Christchurch PM 128 Rising Main For this project CDS installed approximately 3,000m of 800mm OD PE pipe in liquefied sands in Christchurch. Mellons Bay Branch Sewer CDS were contracted to install a single length 115m of 350mmØ gravity sewer to a grade of 0.3%. Springcombe Stormwater Renewals CDS successfully completed a stormwater outlet drill shot, installation of 200m of 630mm OD PE pipe down the middle of a busy St Heliers Road William Souter Stormwater Installation Project CDS completed the William Souter project for Auckland Council Franklin Road Stormwater Upgrade CDS completed these drill shots using its DitchWitch® JT8020